Well Construction and Recovery Monitoring

Experts of drilling department carry out on-site designer supervision on projects execution for construction of oil and gas wells on fields of Orenburg and Ulyanovsk regions, as well as on field Boca de Jaruco, Republic of Cuba throughout the whole complex of technical and process design arrangements accomplished by drilling contractor in the process of well site construction. Over the past three years approximately 200 on-site designer supervisions with preparation of appropriate reports have been carried out.

Comments and proposals made in the process of on-site designer supervision are brought to Client’s and drilling contractor’s notice. At joint geotechnical meetings are made technical decisions with the purpose of successful well drilling in the event of geological complications. Technical and process design decisions applied are ensuring appropriate reliability level and projected period for safe well operation.

Drilling department in 2015 carried out on-site designer supervision on twenty-eight project sites (wells) by implementing corporate integrated control and safety system and by making it possible to provide well site construction engineering and technical maintenance while constructing the most complicated and critical wells at Zarubezhneft JSC.

At present time the process technology service potential of Giprovostokneft drilling department allows carrying out well site construction engineering and technical maintenance on 20 wells per year.